Skip to content

Septic resources

Planning a Septic System for a New Build

Why the septic layout should be considered early and what information helps keep a Vancouver Island building project moving.

TTIS homeowner guide · 6 minute read

This article provides general information only. The appropriate response for a septic system depends on the property, the existing system and the findings of the qualified professionals involved.

Plan the septic system before the site layout is fixed

On an unserviced property, the house, well, driveway and septic system all compete for usable space. Treating the septic system as a late-stage item can create avoidable redesign, access and scheduling problems.

Early assessment helps the project team understand where the system may fit and what information is still required before the building layout is finalized.

Information to assemble

The more reliable information available at the beginning, the easier it is to coordinate the assessment and design work.

  • Property address, legal description or parcel identifier.
  • Current survey, site plan or proposed building layout.
  • Proposed bedroom count and intended property use.
  • Known well, watercourse, pond and drainage locations.
  • Existing septic records if the parcel has previously been developed.
  • Driveway dimensions, gate widths, overhead lines and other access constraints.
  • The broader construction schedule and contacts for the builder or other project professionals.

Assessment and design are separate from construction

The property must first be understood and the appropriate design work completed before an installation can be accurately scoped. Soil, slope, water, available area and the proposed use of the building all influence the process.

Technical determinations and any required design work are handled by the appropriate qualified professional. TTIS coordinates that work with the owner, builder and installation participants.

Protect access and working space

Septic construction requires room for excavation equipment, material delivery, spoil placement and safe movement around the site. Access that works for a passenger vehicle may not work for the machines and trucks required during installation.

Agreeing the access route and staging areas early also helps protect trees, finished driveways and portions of the property that should remain undisturbed.

Coordinate the paperwork and the build

The installation should follow the authorized design and the current project documentation. Construction photographs, measurements and component information should be gathered while the work is visible, rather than reconstructed after it has been covered.

A coordinated process connects assessment, design, installation and completion documentation so the property owner finishes with a usable record of the system.

Official guidance

Check the current official guidance for your project. These references do not replace a property-specific assessment.

Continue reading

Talk to us about your property

Tell us where the property is and what you are trying to do. We will explain the sensible next step for your situation.