Skip to content

Vancouver Island · British Columbia

Septic Systems Built for Vancouver Island

From site assessment and planning through installation and completion, Turtle Tanks Island Systems helps property owners navigate septic projects with clear communication and experienced local support.

Start with your property

What brings you here?

My existing system needs attention

Understand your options for an older system, recurring problems or a possible replacement. An assessment comes before deciding what needs replacing.

Explore repair and replacement planning

I'm planning a new build

Consider wastewater requirements alongside your house, driveway and site layout. Start with the property before choosing a system.

Plan your site assessment

I'm renovating or adding space

Find out what your existing system was designed to serve and whether your proposed changes need further assessment.

Understand the planning process

Not sure where to start? Tell us about your property and we can help identify the next step.

Who we are

Turtle Tanks Island Systems coordinates septic projects on Vancouver Island

TTIS works with property owners across Vancouver Island on the septic side of a property — new installations, replacing systems that have failed, and upgrading systems that no longer suit how a property is used.

Projects are coordinated end to end: understanding the site, working with the appropriate qualified professionals on design, keeping the paperwork moving, building the system, and finishing with documentation you can keep.

Septic pumping, cleaning and routine servicing are not our focus. Our work is the planning and construction side of on-site systems.

More about how we work

How a project runs

A simple, ordered process

Every property is different, but the order of the work rarely changes.

  1. 01

    Enquiry

    You describe the property and what you are trying to do. We ask the questions needed to understand the situation.

  2. 02

    Site assessment

    We walk the property, review existing records, and arrange soils and design input from the appropriate qualified professional.

  3. 03

    Design and permitting

    A system is designed for your site and the authorization paperwork is prepared, submitted and tracked.

  4. 04

    Installation

    The authorized system is built, with the work sequenced around the rest of your project and recorded as it progresses.

  5. 05

    Completion

    The site is finished and tidied, documentation is assembled, and we walk the system with you before we leave.

Recent projects

Work on Island properties

Only genuine TTIS photographs and verified project details are published here.

Black Creek residential septic installation site with tank risers and dispersal field under construction

Residential Gravity Septic System Installation

A residential septic installation completed in Black Creek. TTIS coordinated the project through installation and completion, working with the project participants to keep the construction and documentation stages moving in sequence.

Distribution-field construction on a forested Sproat Lake property

Residential Septic Installation

A residential septic project completed near Sproat Lake in the Port Alberni area. The work required coordination between the property team, construction participants and the appropriate project professionals through installation and completion documentation.

Fabric covering a septic dispersal field during a TTIS gravity septic installation in Port Alberni

Residential Septic Installation in Port Alberni

A separate TTIS residential septic installation project in Port Alberni. Photos document work on a wooded slope, including rock excavation, septic tank placement and connection, pipeline installation and dispersal-field construction.

Green septic tank set into an excavation at a Nanaimo property

Septic System Installation in Nanaimo

A residential septic installation in Nanaimo, documented from the marked work area through excavation, tank installation, PVC pipe trenching and yard restoration.

Where we work

Serving Vancouver Island

TTIS serves Vancouver Island communities from Campbell River through the Comox Valley and Nanaimo, continuing south through the Cowichan Valley, Shawnigan Lake and Saanich. We also consider projects in Port Alberni, Ucluelet, Tofino and other Island communities depending on location, project scope and scheduling.

Travel and scheduling depend on where a property sits, so the best first step is simply to tell us the location.

Areas we serve

Why owners choose TTIS

Practical, documented, local

Local to Vancouver Island

Work is planned around Island conditions — rock, slope, tight rural access and properties that rely on their own well and their own septic system.

Clear communication

You are told what stage the project is at, what is outstanding and what the next decision is, in plain language rather than jargon.

Site-specific solutions

Nothing is applied as a template. What gets built follows what the site, the soils and the qualified professionals involved determine is appropriate.

Coordination that holds together

Designers, installation partners, machines and materials are sequenced so a project moves in the correct order.

Documented work

Photographs and as-built records are captured during construction, so you finish with a record of what is in the ground and where.

Respect for the property

Access routes, staging areas and the parts of the property you want left alone are agreed before the machines arrive.

Questions

Frequently asked questions

Professional standards

Confidence built into every project

Clear professional involvement, provincial standards and project documentation from initial planning through completion.

Authorized Person involvement

A qualified ROWP or professional is assigned according to the project requirements.

BC regulatory framework

Work is completed under British Columbia’s Sewerage System Regulation.

Standard Practice Manual

Planning and construction are reviewed against applicable provincial standards.

Filing through certification

Applicable health-authority filing and completion documentation are coordinated.

The specific Authorized Person and scope are confirmed for each project.

Talk to us about your property

Tell us where the property is and what you are trying to do. We will explain the sensible next step for your situation.